Proverbs 16:3 " Commit your works to the lord and your plans will be established."
 

Monday, September 06, 2010


 Case Study 1

  Daytona Speedway
  Sodium Silicate Based
  Chemical Grouting
 Case Study 2
  
Maitland Center
   Commons
   Sinkhole Grouting
 Case Study 3
   Busch Gardens
   Underpinning
 Case Study 4
   Mayport Naval Air Station
   Polyurethane Grouting
 Case Study 5
   World Golf Village
   Slurry Grouting
 Case Study 6
   Prime-Co Cellular
   Tower Anchors
 Case Study 7
   State of Florida
   Department Of Health
   Underpinning
 Case Study 8
   Bordeaux Club, Inc.
   Club Condominiums
   Helical Anchors
 

 

Case Study 8

Helical Anchors
i

Location: Naples, FL
Engineers: W.J. Johnson Associates.

Problem

Luxury condominiums were constructed with perimeter and load bearing walls founded on augured pilings.  However, interior floor slabs were designed as "Slab on grade."  Due to a layer of very loose soil (N valve of 1-2 blows per foot) subsequent settlement of interior slabs occurred.  Attempts to correct this problem by other contractors nearby properties met with limited success and slabs continued to settle.

Solution

HGS in conjunction with the engineers analyzed the situation and proposed using a series of AB Chance Helical Piers to stabilize and re-level sunken floors.

AB Chance ss-5 helical anchors were installed on a 7' grid pattern to an average depth of 25' thru 10" holes cored in floor slabs.  AB Chance slab brackets were then attached to the piers, then, using HGS's unique "Twist & Lift" leveling tool, floors were raised to within original tolerances.  Core holes were then patched and floor coverings re-installed

Reference Letter