Proverbs 16:3 " Commit your works to the lord and your plans will be established."
 

Thursday, August 21, 2008


 Case Study 1

  Daytona Speedway
  Sodium Silicate Based
  Chemical Grouting
 Case Study 2
  
Maitland Center
   Commons
   Sinkhole Grouting
 Case Study 3
   Busch Gardens
   Underpinning
 Case Study 4
   Mayport Naval Air Station
   Polyurethane Grouting
 Case Study 5
   World Golf Village
   Slurry Grouting
 Case Study 6
   Prime-Co Cellular
   Tower Anchors
 Case Study 7
   State of Florida
   Department Of Health
   Underpinning
 Case Study 8
   Bordeaux Club, Inc.
   Club Condominiums
   Helical Anchors
 

 

Case Study 4

Polyurethane Grouting
i

Naval Station Mayport shield Location: Delta Wharf Improvement - Mayport Naval Air Station
Owner: Department of the Navy
Engineers: Nova/TIC, Joint Venture
General Contractor: Sea Tech Marine International

Problem

During bulkhead improvements, new sheet piling were installed to extend the existing Delta Wharf approximately 200 feet.  During installation the engineers noticed that soil was being lost directly behind old sheet piles, due to the process of piping through leaks at the joints.  Several concrete support structures and steam lines were in danger being damaged due to settlement.

Solution

HGS  in conjunction with The Department of the Navy, Nova/TIC and Sea Tech Marine International, injected Mountain Grout® polyurethane resin directly behind leaking joints, stopping the flow of soil permanently before any damage was done.

Due to the sensitive area in which this work was performed, photographs are unavailable.