Case Study 4 |
 |
Location: |
Delta Wharf Improvement - Mayport Naval Air Station |
|
Owner: |
Department of the Navy |
|
Engineers: |
Nova/TIC, Joint Venture |
|
General Contractor:
|
Sea Tech Marine International |
Problem
During bulkhead improvements, new sheet piling were installed to
extend the existing Delta Wharf approximately 200 feet.
During installation the engineers noticed that soil was being
lost directly behind old sheet piles, due to the process of
piping through leaks at the joints. Several concrete
support structures and steam lines were in danger being damaged
due to settlement.
Solution
HGS in conjunction
with The Department of the Navy, Nova/TIC and Sea Tech Marine
International, injected Mountain Grout®
polyurethane resin directly behind leaking joints, stopping the
flow of soil permanently before any damage was done.
Due to the sensitive
area in which this work was performed, photographs are
unavailable.
|
|