Proverbs 16:3 " Commit your works to the lord and your plans will be established."
 

Thursday, August 21, 2008


 Case Study 1

  Daytona Speedway
  Sodium Silicate Based
  Chemical Grouting
 Case Study 2
  
Maitland Center
   Commons
   Sinkhole Grouting
 Case Study 3
   Busch Gardens
   Underpinning
 Case Study 4
   Mayport Naval Air Station
   Polyurethane Grouting
 Case Study 5
   World Golf Village
   Slurry Grouting
 Case Study 6
   Prime-Co Cellular
   Tower Anchors
 Case Study 7
   State of Florida
   Department Of Health
   Underpinning
 Case Study 8
   Bordeaux Club, Inc.
   Club Condominiums
   Helical Anchors
 

 

Case Study 3

Underpinning
i

Location: Busch Gardens Kumba Roller Coaster Foundation Repairs
Owner: Busch Gardens

Problem

Years of use had weakend foundation caps of roller coaster and were causing unacceptable movement of steel super structure.

Solution

HGS  in accordance with the engineers specifications, removed deteriorated base plate grouts and replaced with Euclid E3-HP, High Performance Epoxy Grout System®.  work was required to be performed at night during the parks closed hours and the nights work had to be completed so the ride would be put into service during the hours of operation.  Work was performed over a periods of several weeks without interruption of the parks operations.