Case Study 3 |
 |
Location: |
Busch Gardens Kumba Roller Coaster Foundation Repairs |
|
Owner: |
Busch Gardens |
Problem
Years of use had weakend foundation caps of roller coaster and
were causing unacceptable movement of steel super structure.
Solution
HGS in accordance with the engineers specifications,
removed deteriorated base plate grouts and replaced with Euclid
E3-HP, High Performance Epoxy Grout System®.
work was required to be performed at night during the parks
closed hours and the nights work had to be completed so the ride
would be put into service during the hours of operation.
Work was performed over a periods of several weeks without
interruption of the parks operations.
|
|